OPERATIONS
GENERAL OPERATIONS
Roaring Fork has constructed the Chalk Bluff Gas Plant, a 60 MMcfd GSP cryogenic facility with CO2 and Natural Gas Liquid (NGL) processing capability. The plant includes a 3000 Bbls/day slug catcher, 5000 Bbls/day condensate stabilizer, and inlet and residue gas compression. Residue gas is delivered to WIC at the Cheyenne Hub in Weld County, CO, and NGLs are delivered to Overland Pass Pipeline Company (OPPL) also at the Cheyenne Hub. Over 100 miles of Low and High Pressure gathering systems feed gas to the Plant from producing areas in Laramie County, WY, and Weld County, CO.
Roaring Fork Midstream also operates a crude oil gathering system with over 100,000 Bbls/day of capacity and includes a truck unloading terminal centrally located for production not directly connected at producer wellheads. The North Silo truck unloading terminal includes automated 3 bay truck unloading conveniently located adjacent to Highway 85 in Section 2, T16N-R64W, Laramie County, WY. Deliveries are currently made to Tallgrass Energy’s Pony Express Pipeline at the Carpenter lateral, with future connections to other major crude takeaway being developed in response to customer demand.
Roaring Fork Interstate Gas Transmission, LLC (RFIGT) has been formed to own and operate an open-access, interstate gas transmission pipeline extending from north of Cheyenne, Wyoming, to an interconnection with Wyoming Interstate Company (WIC) at the Cheyenne Hub in Weld County, Colorado.
Roaring Fork Interstate Gas Transmission, LLC (RFIGT) has been formed to own and operate an open-access, interstate gas transmission pipeline extending from north of Cheyenne, Wyoming, to an interconnection with Wyoming Interstate Company (WIC) at the Cheyenne Hub in Weld County, Colorado.
ROARING FORK MIDSTREAM ASSETS
Roaring Fork Midstream assets include the Chalk Bluff Natural Gas Processing Plant, located 6 miles south of Cheyenne, WY, a 60 MMCFD high efficiency natural gas processing plant with residue natural gas pipeline connections to the Cheyenne Hub and Overland Pass Pipeline Company for NGL delivery. Gathered gas is connected to the plant via both high pressure and low pressure natural gas gathering systems. Roaring Fork also has a crude oil gathering system connecting producer production directly to major crude oil pipelines for reliable, low-cost delivery to major crude oil markets. Produced water gathering to disposal sites and freshwater delivery to producer locations are in development.
ENVIRONMENTAL, SOCIAL AND GOVERNANCE (ESG)
Roaring Fork Midstream intends the integration of environmental, social, and corporate governance (ESG) considerations into its investment strategies, processes, operations, and business practices in the belief that these factors can benefit the company’s performance over the long term, and provide results consistent with the values, culture, and mission of Roaring Fork Midstream. An emphasis on safety is a key factor in meeting the ESG goals of Roaring Fork Midstream.
Corporate Office
1225 17th Street, Suite 2450
Denver, CO 80202